Any data or information, regardless of its form or medium, which is or has been electronically generated by, transmitted via, received by, processed by, or represented in an ICT resource.
A room or a set of rooms along with wiring closets where working equipment used to deliver ICT systems and infrastructure is sited (e.g. server room, UPS room, LAN closet, etc).
A set of ICT systems, communications cabling, and power supplies along with environmental support like equipment racks or cooling system installed in the ICT facility of the corresponding office or reasonably close to it.
An employee or contractor who is responsible according to the terms of reference for planning, architecting, deploying, maintaining supporting and improving overall ICT infrastructure and its components in the corresponding office.
ICT resource: any tangible or intangible asset capable of generating, transmitting, receiving, processing, or representing data in electronic form, where the asset is owned, licensed, operated, managed, or made available by, or otherwise used by, the United Nations;
Hardware, software and firmware of computers, telecommunications and network equipment or other electronic information handling systems and associated equipment. ICT systems include any equipment or interconnected systems or subsystems of equipment that are used in the acquisition, storage, manipulation, management, movement, control, display, switching, interchange, transmission or reception of data/information. [ISO/IEC 24762:2008]
The management and delivery of project activities to achieve specified results including the procurement and delivery of UNDP project activity inputs and their use in producing outputs, as set forth in a signed document, the Annual Work Plan, between UNDP and the Implementing Partner.
According to Article 17 of UNDP’s financial regulations, an implementing partner is “the entity to which the Administrator has entrusted the implementation of UNDP assistance specified in a signed document along with the assumption of full responsibility and accountability for the effective use of UNDP resources and the delivery of outputs, as set forth in such document.
The Independent Evaluation Office is a functionally independent unit within UNDP that supports the oversight and accountability functions of the Executive Board and the management of UNDP, UNCDF and UNV. The structural independence of the Office underpins and guarantees its freedom to conduct evaluations and report evaluation results to the Executive Board. The main role of Office is to conduct independent evaluations according to the plans and costed programmes of work approved by the Executive Board.
The costs incurred by the organization in support of programmes or projects that cannot be directly attributed to such specific programmes or projects.
An individual contractor is an individual engaged by the Organization from time to time under a temporary contract to provide expertise, skills or knowledge for the performance of a specific task or piece of work, which would be short-term by nature, against the payment of an all-inclusive fee. The work assignment may involve full-time or part-time functions similar to those of staff members, such as the provision of translation, editing, language training, public information, secretarial or clerical and part-time maintenance services or other functions that could be performed by staff. An individual contractor need not work on United Nations premises.
A formal declaration following the decision of the CPO that a Respondent is ineligible for a period of time to (a) be awarded and/or partake in contracts financed, administered or executed by UNDP, (b) conduct new business with UNDP as an agent or representative of other vendors, (c) partake in having discussions with UNDP regarding new contracts. Exceptionally, the ineligibility may be permanent.
The Ineligibility List is a central roster, hosted and maintained confidentially by the United Nations Global Marketplace (UNGM) as a protected electronic document that aggregates information provided by each participating entity, including UNDP. Vendors that are subject to sanctions that affect their eligibility, pursuant to sanctions proceedings, shall be entered into the Ineligibility List for a term starting upon notification of the CPO’s decision and ending once they are deemed to be rehabilitated. The Ineligibility List shall have restricted access, and shall not be published or otherwise distributed.
A Vendor who has been debarred by UNDP, and either (1) is the subject of a current period of debarment; or (2) has not requested to be reinstated as an active Vendor via a request for rehabilitation.
In general, raw data that (1) has been verified to be accurate and timely, (2) is specific and organized for a purpose, (3) is presented within a context that gives it meaning and relevance, and which (4) leads to increase in understanding and decrease in uncertainty. The value of information lies solely in its ability to affect a behavior, decision, or outcome. [www.businessdictionary.com]
Information Technology Infrastructure are the components required to operate and manage enterprise IT environments, which includes hardware, software, networking components, an operating system (OS), and data storage, all of which are used to deliver IT services and solutions.
Innovation challenges are defined as prized challenges that Business Units (Country Offices) organize to solicit innovative ideas and solutions to address development challenges which cannot be achieved through traditional solicitation processes.
Innovation challenges solicit ideas and solutions to address development challenges. Innovation challenges: (a) often include stakeholders who are not necessarily affected by the development challenge, but well placed to develop solutions, including private sector actors; (b) typically limit themselves to the generation or testing of ideas, but not their implementation; (c) can be awarded directly by the head of office for grants up to $40,000 without further review. See the policy on innovation challenges. 29. Innovation challenges can be done in projects directly implemented by UNDP or when UNDP provides support services to national implementation (COS services). Low-value grants can be used in parallel to other engagement types with responsible parties or as part of a dedicated grant project.
Inputs are the personnel (including staff, service contract holders, UN Volunteers and consultants), goods, services, partnerships and low-value grants required to produce planned outputs. Inputs are obtained on the basis of the project workplan and the corresponding budget. Where the progress towards planned outputs is not advancing as expected, the project board should review the strategy of the project, including the workplan, budget and inputs.
Covers the estimates as approved by the Executive Board relating to the activities and associated costs in the cost categories of development effectiveness, United Nations Development Coordination, management and special purpose.
Institutional effectiveness projects manage inputs and activities that enable UNDP to contribute to development results. This type of project does not require a project document and can operate on a continuing basis. An annual workplan and budget must be prepared and approved by staff with appropriate delegation of authority
Instructions to Offerors/Proposers – the complete set of documents which provides Offerors/Proposers with all information needed and procedures to be followed in the course of preparing their Offer/Proposal.
Intangible Assets are the non-physical items of value that UNDP owns. The defining characteristics of an Intangible Asset are the lack of physical existence (cannot be touched), and having no set monetary value. They cannot be seen or touched, but are nonetheless important to UNDP’s success. Intangible Assets may be internally generated, such as internally developed software, or acquired from external sources e.g. goodwill (which may not apply to UNDP), or brand name e.g. If UNDP uses a reputable trademark in implementing one of its projects.
The primary inter-agency mechanism for the HACT framework at HQ level is the HACT Advisory Committee. It serves in an advisory capacity only, providing inter-agency policy advice, technical guidance and support to agencies implementing the HACT framework. The committee consists of individuals from finance and programme units from the various agencies.
A temporary suspension of a Vendor’s eligibility to participate in new procurement processes, as further described in paragraph 66 of the Vendor Sanctions Policy to protect UNDP’s interests pending the completion of either an investigation into Proscribed Practices or the VRC process. Interim suspensions are internal measures that are not reported on the UNGM.
Internal audit report means the final report resulting from an audit signed by the Director of the Office of Audit and Investigations and issued to the Administrator and the auditees for their consideration and for the implementation of recommendations. The report is also provided to the UN Board of Auditors.
Internal control is a process, effected by a governing body, management or other personnel of an organization, designed to provide reasonable assurance regarding the achievement of objectives in the categories of (i) effectiveness and efficiency of operations, (ii) reliability of financial reporting, and (iii) compliance with applicable laws and regulations.
The Internal Control Framework covers key control factors such as planning, monitoring, communication, policies, procedures, segregation of duties, individual authorities and accountabilities that combined, inter alia: safeguard assets from inappropriate use and loss from fraud and error; help ensure the quality of internal and external reporting, through the maintenance of proper records and information flows; facilitate compliance with applicable laws, regulations and internal policies.
The International Personnel Services Agreement (“IPSA”) is a legal instrument established by the United Nations Development Programme in order to engage the services of individuals to provide a time-limited service to UNDP under a services-based contract. This new modality has two key objectives: On the one hand, it aims to provide UNDP with a comprehensive, flexible and cost-effective contractual framework which responds to project- and programme-based, as well as operational and administrative, requirements. On the other, the IPSA will at the same time provide for attractive, stable and fair conditions of employment which ensure that UNDP is able to attract, select and retain the services of high-quality individuals. Individuals engaged under this instrument have the status of International Personnel Service Agreement Holders, and are specifically engaged in recognition of their skills and expertise, to provide identified deliverables. These individuals are not UNDP staff members, but are considered affiliate personnel and, as such are not governed by or subject to the United Nations’ Staff Regulations and Rules. Nor is this contract modality governed by national legislation in countries where UNDP operates. Given that the services covered by the IPSA may only be provided by natural and not legal persons (e.g., duly formed/registered companies), and by non-incorporated partnerships, the IPSA falls within the overall scope of UNDP Human Resource management framework.
The purpose of the Internship programme is to provide students and recent graduates from diverse academic backgrounds exposure to development issues and a first-hand experience with the day-to-day working environment of UNDP.
Inventory in transit is en-route goods purchased that are in the ownership of UNDP but in the possession of the carrier. The inventory in transit that is owned by UNDP (based on INCOTERMS 2020) must be recorded as inventories. Therefore, it is very important to determine the ownership of inventory items in transit based on respective INCOTERMS 2020.
The process of planning and conducting appropriate lines of inquiry to determine the factual basis of allegations, and, if substantiated, assembling a dossier of evidence to permit a decision at a later stage as to whether formal charges of misconduct should be made against a staff member, or, whether the case should be closed.
is any person who is not the investigation subject but who cooperates with an investigation, for instance by being interviewed or by providing information. Investigation participants may be staff members cooperating pursuant to Staff Regulation 1.2 (r) and Staff Rule 1.2 (c), or non-staff and third persons who provide relevant information.
A member of the Office of Audit and Investigations (OAI) or a person authorised by OAI to conduct an investigation related to cases of allegations of wrongdoing. An investigator may also be a person authorised directly by the Secretary-General or the Administrator in certain cases, to conduct an investigation into allegations of wrongdoing.
An invitation to bid is used to procure goods or works valued at US $200,000 or more. It does not require prospective bidders to specify the manner of production, technical approaches or management/supervision of required activities. The invitation to bid only requests details on costs to meet precise specifications for goods. The method may also be used in procuring construction works or services that can be quantitatively and qualitatively defined.
Refer to ICT components that can no longer perform their intended function due to loss of compatibility with other ICT systems or failing to meet standards. Obsolete components cannot and should not be used UNDP ICT environments. For example, hardware becomes obsolete when it is unable to efficiently run a minimal version of UNDP standard software. Software becomes obsolete when it is unable to integrate with other ICT infrastructure components or it is no longer able to run on hardware with minimum supported configuration defined in this document.
Obstruction or Obstructive Practice is an act or omission by a vendor that prevents or hinders UNDP’s data gathering and analysis in a particular case.
The Offeror’s response to the Invitation to Offer, including the Offer Submission Form, Technical Offer and Price Schedule and all other documentation attached to the Offer.
An Offer of Settlement, as further described in paragraphs 44 and 45 below. An OoS may be made by UNDP to the Respondent(s) under either the DRP and PRP
A staff member or a group of staff members who are designated with an authority for acquiring, creating, maintaining and disposing of information and corresponding ICT systems as well as to make operational, strategic, financial or human resource decisions in the corresponding office (e.g. Director of the Bureau or Office, Deputy Director, Resident Representative, Country Director or Operations Manager, etc).
The OAI, as internal auditor of UNDP, conducts its audit to give reasonable assurance to UNDP senior management about the activities undertaken by a given UNDP unit and to bring to their attention areas requiring improvement. OAI reports to the Administrator.
This sourcing method creates awareness in the business community of an opportunity related to a specific project, and requires advertisement in an appropriate medium (including, but not limited to, the UNDP global website) depending on the nature of the procurement activity. In an open competitive bidding process, there will be no shortlisted companies; consequently, all vendors wishing to participate in the process are invited to do so.
Opening competition to the international market provides equal opportunity to all eligible vendors. It entails a public advertisement in globally accessible media. The following conditions must be met: a. The procurement opportunity should be advertised on UNDP’s corporate website; b. It should be posted in the UN Global Marketplace (i.e., www.ungm.org); and c. Advertisements should remain online for a minimum of two weeks.
These are trust funds established by UNDP to receive contributions from multiple donors for global, regional or broad thematic programmes, which usually consist of a number of projects. Their terms of reference outline their purpose, objectives and administrative arrangements.
An Operating Lease is a lease other than a Finance Lease. For office space, a Lease that has been formulated and agreed following UNDP’s Standard Lease Template will be an Operating Lease.
Operations Management & Administration: Activities related to overall staff/office management and the provision of workplace and support services (ICT, Finance, OHR, UNDP security, travel, assets and general services) which permit UNDP to carry out the mission of the organization (but excluding direct project implementation support). Activities related to the harmonization and simplification of UN operational processes and business practices should also be included here.
The VRC may recommend, and the CPO may decide to impose, other sanctions that it finds appropriate, including requiring that future contracts with the Vendor reflect special conditions, or that the vendor compensate UNDP for any loses and/or costs sustained or incurred by it as a result of the Vendor’s involvement in a Proscribed Practice.
Overpayments: Payments made by the Organization to a staff member in excess of his/her salary, benefits and entitlements under the UN Staff Regulations and Staff Rules and relevant policies;
Oversight means the general process of review, monitoring, evaluation, supervision, reporting and audit programmes, activities, policy implementation, and results of the organization. This is to ensure organizational, financial, operational and ethical accountability, effectiveness of internal controls, and the prevention of fraud and malpractice.
All UNDP programmes and projects must be governed by a multi-stakeholder board or committee established to review performance based on monitoring and evaluation, and address implementation issues to ensure quality delivery of results. In crisis contexts where constraints prevent the government from being able to participate in relevant programme and/or project boards, the Regional Bureau can grant approval for modified oversight mechanisms, taking risks and stakeholders into account.
Overtime means the time worked in excess of the scheduled workday or scheduled workweek or during any of the UN official holidays. 2. The following is not considered as overtime: a) Time spent travelling to and from the place of work; b) Work performed during the lunch period; c) Work performed outside regular working hours due to the adoption of a shift system except when the total time worked exceeds the scheduled workday or workweek. Overtime compensation (OC) is payable to General Service (GS) staff members, with Permanent, Continuing or Fixed-Term appointments governed by the UN Staff Regulations and Staff Rules. OC is neither payable to National Professional Officers (NPOs) nor to International Professional staff members.